Practical No 5

                                        Practical No 5

Aim: Prepare board SRS for the above selected project.

This page is an SRS for Bank management system
    The Traditional way of maintaining details of a user in a bank was to enter the details and record  them. Every time the user need to perform some transactions he has to go to bank and perform  the necessary actions, which may not be so feasible all the time. It may be a hard­ hitting task for  the users and the bankers too. The project gives real life understanding of  banking and  activities performed by various roles in the supply chain. Here, we provide an automation for  banking system through BMS (Bank management System). Banking system project captures activities performed by different roles in real life banking which provides enhanced techniques  for maintaining the required in­ formation up­ to ­date, which results in efficiency. The project  gives real life understanding of  banking and activities performed by various roles in the  supply chain.
This Product will automate of banking transaction process.This  Project  investigates  the entry  threshold  for  providing  a  new  transaction service  channel  via  the  real  options approach,  where  the  entry  thre shold  is established  by using an banking  system  designed    for the use of normal users.

Software Design

Software design is a mechanism to transform user requirements into some suitable form, which helps the programmer in software coding and implementation. It deals with representing the client's requirement, as described in SRS (Software Requirement Specification) document, into a form, i.e., easily implementable using programming language.

Coding

Once the system design  is completed, the next phase is coding. In this phase, developers start build the entire system by writing code using the chosen programming language. In the coding phase, tasks are divided into units or modules and assigned to the various developers. It is the longest phase of the Software Development Life Cycle process.


Testing

Once the software is complete, and it is deployed in the testing environment. The testing team starts testing the functionality of the entire system. This is done to verify that the entire application works according to the customer requirement.

Purpose

The main purpose of bank management system is solving financial application of a customer in banking enviorement in order to nuture needs of an end banking user by providing various way to perform task.

Scope 

This Product will automate of banking transaction process.This  Project  investigates  the  entry  threshold  for  providing  a  new  transaction service  channel  via  the  real  options  approach,  where  the  entry  threshold  is established  by using an Internet banking  system designed  for the use of normal users(individuals).

Feasiblity Study

Once the requirement analysis phase is completed the next sdlc step is to define and document software needs. This process conducted with the help of ‘Software Requirement Specification’ document also known as ‘SRS’ document. It includes everything which should be designed and developed during the project life cycle.

Result

We have learned to prepare board SRS for bank management system.





Popular posts from this blog

Practical No 11

Practical No 7

Practical No 12